Services/Earthworks

Excavator cutting and levelling a residential site

No job too small, or too big.

We dial before we dig, every time, on every job. A cheap quote that hits a gas main is not a cheap quote.
Kolcher Environmental, in our own words

Excavation, bulk earthworks, site cuts and fills, levelling, trenching, drainage, driveway formation and site clearing. Half a day with a mini excavator to fix a drainage run, or weeks of bulk earthworks ahead of a build. We quote both the same way, which is by coming and looking at it.

01

What we take on

Site cuts and fills, driveway and pad formation, trenching for services, stormwater and subsoil drainage, detention basins, batter shaping, site clearing, rock removal, and levelling for turf, slabs or sheds. Anything from a mini excavator in a side access to a full bulk earthworks programme.

02

Access is the first question

On most jobs the machine that fits is the machine that decides the price, not the volume of dirt. We come and measure the gate, the overhead wires and the turning circle before we quote, because finding out on day one that nothing fits is how a job doubles.

03

Where the spoil goes

Cut and fill on site where we can, because moving dirt off a site is expensive and moving it back on is worse. Where it has to go, it goes to a licensed facility and you get the dockets.

04

Services located first

Dial Before You Dig on every job, plus a scan where the plans look optimistic. It costs a couple of hundred dollars and it is the cheapest insurance on the whole project.

05

Wet weather and erosion

Sediment control goes in before the machine starts, not after the first storm and a council notice. On anything near a waterway or a stormwater inlet this is not optional and we treat it that way.

Common questions

Is there a minimum job?

No. Half a day with a mini excavator is a perfectly normal job for us and we would rather do it than send you elsewhere. Small jobs are quoted at a day rate, larger ones as a fixed price on scope.

Can you get into a tight backyard?

Usually. A 1.7 tonne machine goes through a 900 millimetre gate. Below that it is barrows and a bobcat on the other side of the fence, and we will be honest about what that costs.

Do you need approvals?

Depends entirely on volume, retaining height and whether you are near a waterway or an easement. We will tell you what your job needs on the site walk, before you are committed to anything.

Tell us what needs moving.

Address, a rough idea of the job and a photo if you have one. We will come and look at access, tell you what machine fits, and price it properly.

Get a quote